Manufacturing Factories
Requires:
COIExtended-Core
Description
Collection a manufacuring factories mostly for mid to endgame
Mechanical part are usually included in the specific factories whereas electronic are imported from the electronics factory.
Included are:
- Lab Equipment
- Vehicle Parts
- Electronics & Computers
- Maintenance
- Electronics IV
- Construction Parts
- Misc Goods (Consumer Electronics, Houshold Goods, Houshold Appliances and Office Supplies)
Changelog:
- 2026-03-19: Added misc goods
- 2026-03-19: Fixed wrong transport belt for construction parts concrete
- 2026-03-25: Fixed input & output storage priority of misc goods factory
- 2026-03-25: Fixed conveyor tier for steel import of construction parts factory
- 2026-04-16: Extended consturction parts IV with additonal input for sugar cane
- 2026-04-18: Added two concrete factories
- 2026-06-22: Allow import of recycling materials in the Maintenance factory
- 2026-06-22: Fix logic of construction parts storage so that all tiers of parts are available at the same time
- 2026-06-22: Fix logic of vehicle parts storage so that all tiers of parts are available at the same time
- 2026-06-22: Fix logic of lab equipment storage so that all tiers of parts are available at the same time
Comments (1)
Hey ! Nice layout ! Would be nice to have a lower tier BPs (like before Construction part IV or before Lab II)