Coal Hybrid TES Power Plant

by Magermh 3 months ago
59

Forrester Hybrid Thermal Storage Power Plant (PP)

Takes a bit to charge. The rest is up to a player. Requires 12 solar to run as a thermal mechanical storage in TES. Its a hybrid of a coal hybrid. With 78 mechanical power. May handle a third turbine or fourth. Upgradeable by boiler replacement. Piping is for timings. May run with 64 solar panel to run electric boiler for more storage.

12 steam electric boiler with no solar panels.

24 steam electric boiler with solar panels.

Related to the "Forestry Coal Hybrid TES Power Plant (PP)"

Recommended field change. Retro-grade or downgrade one of the tear II high pressure turbines connected to the thermal storage and keep the electric "Peaker" boiler at 12 steam in surplus. Add 2 rows of 10 solar cells. Bringing the number of rows to 5 rows of 10. Will be updated in latter release.

Version Released Downloads Copy
2 Current 3 months ago 31
1 4 months ago 28
No comments yet.