My Manufacturing hub
Upgraded Manufacturing hub with step to step build-up parts.
this new build is 141 cells on 160 cells big
i completly overhauled my original hub into this one introducing extra production:
- Electronics IV
- solar Cell
- mono solar cell
integrated train depot + plenty of room for depot expansion and vehicle depot with road Barriers for more easy assembly of the parts so u do not need to guess how each part need to connect with the other
production list is max tier buildings only!
i am also building a concrete/ glass setup that can support this build
Very important note is to build the blueprints according to their number order, if not done that it might be possible for stuff not properly working
| Version | Released | Downloads | Copy |
|---|---|---|---|
| 3 Current | 10 days ago | 137 | |
| 2 | 3 months ago | 629 | |
| 1 | 3 months ago | 7 |
Paste it into the game: Blueprints → Import from string. The game fetches the blueprint itself, so the link is all you need.
On an older game build that doesn't take links? Copy the blueprint string instead:
can you include the inputs and outputs in description?
ok, it gonna take some time to write it all down
Clearly you haven't met me.
You're missing a copper input for the microchip line. No idea how it's supposed to get in there, but it's just missing.
I haven't played in a while due an increase of work time at my work
But i know of the missing conveyor most likely happend during splitting of the entire build into smaller pieces.
However i was not planning on fixing that, before i stopped playing i was re-doing the entire lay-out while keeping the dimentions of the entire build.
I will pick up on this and try to get it Running asap.
Merci Pour tes Plans je vais tester cela, j avais une préférence pour ceux de Calen
mais j aime bien ton Hub et maintenant tes fonderies même si je ne comprend pas le fonctionnement du stockage. si tu as une chaine YouTube ou des tutoriaux je suis preneur. merci encore et bonne continuation
Ovace
Les zones de stockage sont organisées comme suit :
-Sur la gauche, vous trouverez toutes les zones de stockage pour les matières premières importées.
-La partie inférieure est réservée aux rebuts ainsi qu'aux pièces provenant de véhicules plus anciens, destinées à être réutilisées.
-Enfin, sur la droite, sont stockés tous les produits finis, à l'exception de ceux nécessaires à la fabrication d'autres produits. J'ai prévu suffisamment d'espace pour permettre aux véhicules de manœuvrer entre les zones de stockage ; toutefois, le transport peut également s'effectuer directement par tapis roulants ou par train.
J'espère que ces précisions vous seront utiles.
Veuillez m'excuser si mon français laisse à désirer.