Dig and Dump Boys

by Sternheart 2 years ago
173

Designed for big land projects to reduce clogging on the sorters and better flow on the u-belts (Rock, Dirt and Sand).

(Recomend to tile the flow first (check photo 8) as I am sure the markings work with blueprints.)

Contents:

2 sorters 3 stage 2 loose storages 3 stage 1 large loose storages 3 towers Stage 2 u-belts 10 u-belt lifts Lots of Walls

Version Released Downloads Copy
3 Current 2 years ago 173
2 2 years ago 0
1 2 years ago 0
No comments yet.