402
  • Compact Waste Burning for Power with extra export of Chlorine (from brine)
  • everything else is set up with overflow
  • Inport:
  • Waste (Main Packed, max 72 unpacked Waste/min)
  • Seawater(1 Pump)
  • Export:
  • Chlorine (Brine overflows to liquid dump if Chlorine Storage is full)
  • Oxygen (overflows to Smokestack if oxygen Storage is full)
  • Carbon Dioxid (Overflows to Smoke Stack if Storage Full)
  • Sulfur (Overflows to Burner(Solid) if Storage full)
  • ======================================================
  • https://doubleaxe.github.io/daxfb-calculator/?link=JweyJwN&name=waste-burner
  • Waste Burner
  • DAXFBCIC$eNp9kjFPxDAMhf-LZw-x4ySXjCBADCAGNnTLVdxxqALEwFLdfyd
  • t4jQHiO356Yuf7XaCI6SnCd4ggRwA4SOXlhgp8hbhc7Zf4YSFMBUgbxx6q8R
  • sv_Pso9kqK8rG6DEY0W7ZHiCJYrsH5SgSkii3eyygRdhDooZfVDw4l8Mqe1N
  • Yr9Sgg4bAyGZTuYELx3-MS8_1iUFx-oD2bXW60uM4RhFS4hp-h-bRvPcaSo2
  • 401VdFOSoKffnUzFaNEhtMu4PaduB_tlFT89WLNpIP0-f63H56uMSV6LGpYl
  • t2qJ02jUd0DftMDS96XQ467P6sfNj55PB2BfUJZiuk-lerzrza0G0VHnFF0g
  • THPLel7d58a_59zh9A_AeuVs
  • Input
  • 8.26MW Electricity
  • 20pm Maintenance I
  • 5.18pm Maintenance II
  • 109 Worker
  • 425pm Waste
  • Output
  • 28.3 Air pollution
  • 14.4MW Electricity
  • 7.07pm Sulfur
  • 84.9pm Carbon dioxide
  • 11.8pm Chlorine
  • 35.4pm Oxygen
  • Build Cost
  • 200 Concrete slab
  • 170 Construction Parts II
  • 475 Construction Parts III
  • 100 Construction Parts IV
  • 40 Electronics
  • 30 Steel