T1 Concrete Production

by CaptainBligh 1 year ago
257

T1 Concrete Production

  • Everything T1 to start with, but can be upgraded to T2
  • Uses loose and flat lifts, so you must have researched those as well as concrete
  • Included Fuel Gas (or other) gas storage for upgrading coal-fired kilns with gas-fired (will also need to upgrade smokestack)
  • Alerts on storage when less than 25% full
  • Crushers in place to create manufactured sand

There are 6 kilns and 6 concrete mixers. Depending on how/when you upgrade kilns from coal to gas (and mixers to T2+), you may overproduce cement, so you can either pause some of the kilns or set-up a contract to trade the excess cement for coal.