Concrete slab factory

by georgius 1 year ago
225

For concrete slab production up to 8x T2 mixers
Author: georgius

Description

The concrete slab production facility is designed for starting of concrete slab production up to 8x T2 mixers. It is designed to be used immediately when Conveyor belts, Transports balancing and Concrete production researches are finished.

Options

Depending on available resources it is possible to build several options:

  • Option 1: required resources are Water, Limestone, Coal and Rock
  • Option 2: required resources are Water, Limestone, Coal, Rock and Slag
  • Option 3: required resources are Water, Limestone, Coal, Rock and Sand
  • Option 4: required resources are Water, Limestone, Coal, Sand and Slag

The options can be combined together to maintain production even if some resource is temporarily depleted.

Stages
  • Stage 1: initial stage
  • Stage 2: mixer 2
  • Stage 3: mixers 3, 4
  • Stage 4: mixer 5
  • Stage 5: storage II upgrade (required Storage II)
  • Stage 6: mixer 6 (required Conveyor belts II)
  • Stage 7: mixers 7, 8
  • Stage 8: large storage upgrade (required Storage (large) I)
  • Stage 9: exhaust scrubber (required Exhaust filtration)
  • Stage 10: mixers 1, 2 upgrade (required Crusher (large), Mixer II)
  • Stage 11: mixers 3, 4 upgrade
  • Stage 12: mixers 5, 6 upgrade
  • Stage 13: mixers 7, 8 upgrade

Option 1 - Water, Limestone, Coal, Rock

Installation images https://imgur.com/a/RjZuU3v.

Required Materials

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Construction Parts 186/186 1/187 6/193 8/201 1/202 6/208 15/223 3/226 1/227 3/230 1/231
Construction Parts II 185/185 44/229 171/400 82/482 75/557 90/647 125/772 -24/748 176/924 -38/886 37/923 42/965 39/1004
Construction Parts III 3/3 10/13 91/104 30/134 290/424 50/474 53/527 54/584
Rubber 44/44 14/58 41/99 22/121 24/145 49/194 1/195 4/199 2/201 7/208 11/219 12/231
Electronics 75/75
Concrete slab 80/80
Steel 30/30 30/60 30/90 30/120
Inputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Limestone 4.5/4.5 4.5/9 9/18 4.5/22.5 4.5/27 9/36 9/45 9/54 9/63 9/72
Coal 0.75/0.75 0.75/1.5 1.5/3 0.75/3.75 0.75/4.5 1.5/6 1.5/7.5 1.5/9 1.5/10.5 1.5/12
Rock 12/12 12/24 24/48 12/60 12/72 24/96 24/120 24/144 24/168 24/192
Water 6/6 6/12 12/24 6/30 6/36 12/48 2.4/50.4 12.6/63 12.6/75.6 12.6/88.2 12.8/101
Workers 16/16 4/20 18/38 10/48 8/56 14/70 10/80 14/94 12/106 12/118 12/130
Power (MW)* 0.41/0.41 0.42/0.83 0.82/1.65 0.41/2.06 0.42/2.48 0.82/3.3 0.04/3.34 0.08/3.42 0.69/4.11 0.68/4.79 0.69/5.48
Maintenance 4.75/4.75 4.75/9.5 9.5/19 4.8/23.8 4.7/28.5 9.5/38 0.8/38.8 4.7/43.5 8.7/52.2 8.7/60.9 8.7/69.6

*without conveyor belts

Outputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Concrete slab 12/12 12/24 24/48 12/60 12/72 24/96 24/120 24/144 24/168 24/192
Air pollution 2.25/2.25 2.25/4.5 4.5/9 2.3/11.3 2.2/13.5 4.5/18 -13.2/4.8 1.2/6 1.2/7.2 1.2/8.4 1.2/9.6
Sulfur 1.2/1.2 0.3/1.5 0.3/1.8 0.3/2.1 0.3/2.4
Carbon dioxide 14.4/14.4 3.6/18 3.6/21.6 3.6/25.2 3.6/28.8

Option 2 - Water, Limestone, Coal, Rock, Slag

Installation images https://imgur.com/a/bwPo0J0.

Required Materials

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Construction Parts 216/216 1/217 6/223 8/231 1/232 6/238 15/253 3/256 1/257 3/260 1/261
Construction Parts II 187/187 44/231 171/402 82/484 90/574 90/664 125/789 -24/765 176/941 -38/903 37/940 42/982 39/1024
Construction Parts III 3/3 11/14 91/105 30/135 290/425 50/475 53/528 54/582
Rubber 51/51 14/65 41/106 22/128 24/152 50/202 1/203 4/207 2/209 7/216 11/227 12/239
Electronics 90/90
Concrete slab 80/80
Steel 30/30 30/60 30/90 30/120
Inputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Limestone 4.5/4.5 4.5/9 9/18 4.5/22.5 4.5/27 9/36 9/45 9/54 9/63 9/72
Coal 0.75/0.75 0.75/1.5 1.5/3 0.75/3.75 0.75/4.5 1.5/6 1.5/7.5 1.5/9 1.5/10.5 1.5/12
Rock 3/3 3/6 6/12 3/15 3/18 6/24 6/30 6/36 6/42 6/48
Water 6/6 6/12 12/24 6/30 6/36 12/48 2.4/50.4 12.6/63 12.6/75.6 12.6/88.2 12.8/101
Slag 9/9 9/18 18/36 9/45 9/54 18/72 18/90 18/108 18/126 18/144
Workers 16/16 4/20 18/38 10/48 8/56 14/70 10/80 14/94 12/106 12/118 12/130
Power (MW)* 0.41/0.41 0.42/0.83 0.82/1.65 0.41/2.06 0.42/2.48 0.82/3.3 0.04/3.34 0.08/3.42 0.69/4.11 0.68/4.79 0.69/5.48
Maintenance 4.75/4.75 4.75/9 10/19 4.8/23.8 4.7/28.5 9.5/38 0.8/38.8 4.7/43.5 8.7/52.2 8.7/60.9 8.7/69.6

*without conveyor belts

Outputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Concrete slab 12/12 12/24 24/48 12/60 12/72 24/96 24/120 24/144 24/168 24/192
Air pollution 2.25/2.25 2.25/4.5 4.5/9 2.3/11.3 2.2/13.5 4.5/18 -13.2/4.8 1.2/6 1.2/7.2 1.2/8.4 1.2/9.6
Sulfur 1.2/1.2 0.3/1.5 0.3/1.8 0.3/2.1 0.3/2.4
Carbon dioxide 14.4/14.4 3.6/18 3.6/21.6 3.6/25.2 3.6/28.8

Option 3 - Water, Limestone, Coal, Rock, Sand

Installation images https://imgur.com/a/TBlJ9zA.

Required Materials

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Construction Parts 216/216 1/217 6/223 8/231 1/232 6/238 15/253 3/256 1/257 3/260 1/261
Construction Parts II 138/138 44/182 148/330 82/412 90/502 67/569 125/694 -24/670 176/846 -11/835 37/872 42/914 39/953
Construction Parts III 9/9 4/13 91/104 30/134 170/304 50/354 53/407 54/461
Rubber 42/42 14/56 38/94 22/116 31/147 39/186 1/187 4/191 1/192 7/199 11/210 12/222
Electronics 90/90
Concrete slab 80/80
Steel 30/30 30/60 30/90 30/120
Inputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Limestone 4.5/4.5 4.5/9 9/18 4.5/22.5 4.5/27 9/36 9/45 9/54 9/63 9/72
Coal 0.75/0.75 0.75/1.5 1.5/3 0.75/3.75 0.75/4.5 1.5/6 1.5/7.5 1.5/9 1.5/10.5 1.5/12
Rock 9/9 9/18 18/36 9/45 9/54 18/72 18/90 18/108 18/126 18/144
Water 6/6 6/12 12/24 6/30 6/36 12/48 2.4/50.4 12.6/63 12.6/75.6 12.6/88.2 12.8/101
Sand 3/3 3/6 6/12 3/15 3/18 6/24 6/30 6/36 6/42 6/48
Workers 12/12 4/16 16/32 10/42 6/48 14/62 10/72 12/84 12/96 12/108 12/120
Power (MW)* 0.26/0.26 0.26/0.52 0.53/1.05 0.26/1.31 0.26/1.57 0.53/2.1 0.04/2.14 0.16/2.3 0.46/2.76 0.46/3.22 0.46/3.68
Maintenance 3.75/3.75 4/7.75 7.5/15.25 3.55/18.8 3.7/22.5 7.5/30 0.8/30.8 5.2/36 7.2/43.2 7.2/50.4 7.2/57.6

*without conveyor belts

Outputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Concrete slab 12/12 12/24 24/48 12/60 12/72 24/96 24/120 24/144 24/168 24/192
Air pollution 2.25/2.25 2.25/4.5 4.5/9 2.3/11.3 2.2/13.5 4.5/18 -13.2/4.8 1.2/6 1.2/7.2 1.2/8.4 1.2/9.6
Sulfur 1.2/1.2 0.3/1.5 0.3/1.8 0.3/2.1 0.3/2.4
Carbon dioxide 14.4/14.4 3.6/18 3.6/21.6 3.6/25.2 3.6/28.8

Option 4 - Water, Limestone, Coal, Sand, Slag

Installation images https://imgur.com/a/HL17kwN.

Required Materials

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Construction Parts 216/216 1/217 6/223 8/231 1/232 6/238 15/253 3/256 1/257 3/260 1/261
Construction Parts II 139/139 44/183 148/331 82/413 90/503 67/570 125/695 -24/671 176/847 -11/836 37/873 42/915 39/954
Construction Parts III 3/3 10/13 91/104 30/134 170/304 50/354 53/407 54/461
Rubber 43/43 14/57 38/95 22/117 21/138 49/187 1/188 4/192 1/193 7/200 11/211 12/223
Electronics 90/90
Concrete slab 80/80
Steel 30/30 30/60 30/90 30/120
Inputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Limestone 4.5/4.5 4.5/9 9/18 4.5/22.5 4.5/27 9/36 9/45 9/54 9/63 9/72
Coal 0.75/0.75 0.75/1.5 1.5/3 0.75/3.75 0.75/4.5 1.5/6 1.5/7.5 1.5/9 1.5/10.5 1.5/12
Water 6/6 6/12 12/24 6/30 6/36 12/48 2.4/50.4 12.6/63 12.6/75.6 12.6/88.2 12.8/101
Sand 3/3 3/6 6/12 3/15 3/18 6/24 6/30 6/36 6/42 6/48
Slag 9/9 9/18 18/36 9/45 9/54 18/72 18/90 18/108 18/126 18/144
Workers 12/12 4/16 16/32 10/42 6/48 14/62 10/72 12/84 12/96 12/108 12/120
Power (MW)* 0.26/0.26 0.26/0.52 0.53/1.05 0.26/1.31 0.26/1.57 0.53/2.1 0.04/2.14 0.16/2.3 0.46/2.76 0.46/3.22 0.46/3.68
Maintenance 3.75/3.75 3.75/7.5 7.5/15 3.8/18.8 3.7/22.8 7.2/30 0.8/30.8 5.2/36 7.2/43.2 7.2/50.4 7.2/57.6

*without conveyor belts

Outputs

values with an x/x format indicate change/total

Name Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13
Concrete slab 12/12 12/24 24/48 12/60 12/72 24/96 24/120 24/144 24/168 24/192
Air pollution 2.25/2.25 2.25/4.5 4.5/9 2.3/11.3 2.2/13.5 4.5/18 -13.2/4.8 1.2/6 1.2/7.2 1.2/8.4 1.2/9.6
Sulfur 1.2/1.2 0.3/1.5 0.3/1.8 0.3/2.1 0.3/2.4
Carbon dioxide 14.4/14.4 3.6/18 3.6/21.6 3.6/25.2 3.6/28.8

Cement addon

Installation images https://imgur.com/a/vGSJgpX.

Stages
  • Prerequisite: full concrete slab factory (does not depend on built option)
  • Stage 1: cement storage
  • Stage 2: cement connector
  • Stage 3 to 8: cement production

Changes

Version Changes
7 added cement addon
6 changed shape of conveyor belt to mixer 1
5 added option 4 (all four options available)
4 added option 1
3 added option 2
2 only option 3 - wrong version
1 initial version
Version Released Downloads Copy
7 Current 1 year ago 210
6 1 year ago 0
5 1 year ago 1
4 1 year ago 1
3 1 year ago 5
2 1 year ago 0
1 1 year ago 8
No comments yet.