4WaysBelt Balancer
by Zai
1 year ago
74
4WaysBelt Balancer
This blueprint merges and splits up to 4 mining lines (2 lanes each) into a smooth, balanced flow:
- Inputs: 4 directions × 2 belts = 8 total lanes
- Merge: Aggregates all 8 lanes into 2 central belts without congestion
- Balance: Evenly distributes throughput so no single lane overloads
- Split: Feeds back out to 4 directions × 2 belts or channels into main storage lines
- Use Case: Connect multiple excavators or truck unload points to one backbone conveyor—guarantees nonstop, high‑volume mud & stone transport
| Version | Released | Downloads | Copy |
|---|---|---|---|
| 1 Current | 1 year ago | 74 |
No comments yet.
Link copied to clipboard
Paste it into the game: Blueprints → Import from string. The game fetches the blueprint itself, so the link is all you need.
On an older game build that doesn't take links? Copy the blueprint string instead: