Reassignment of logistics zones for transport

This topic is closed (tagged ).
8 days ago

Dear developers, it would be very cool and not as labor-intensive to implement, as it seems to me, to be able to change the logistics zone for the installed amount of transport with the same filters as you have already implemented. It would also be very appropriate to replace (or scrap) vehicles at a car plant in one logistics zone so that the same number of vehicles are built in a new logistics zone. This would fit very well into the new realities of the game and its new mechanics with bridges, when at one plant in one logistics zone, units of equipment are dismantled, spare parts are transported in any convenient way, and at another automobile plant in another logistics zone, new units of equipment are assembled from delivered materials.

7 days ago

I'm not one of the devs, but I'm having trouble understanding what you're suggesting here. If I'm reading it right... you're asking for "vehicle replacement, but make the new one at a different vehicle depot than the old is scrapped in", right? And "reassign all trucks from logistics zone X to zone Y"?

Personally, since excavators have a habit of trampling the beautiful highway fences on my bridges (model overlap), it does make sense to implement a "transport vehicles by rail" option, and tying that transport to Logistics Zones is a plausible way to make it, well, plausible.

7 days ago

computerneek wrote:

I'm not one of the devs, but I'm having trouble understanding what you're suggesting here. If I'm reading it right... you're asking for "vehicle replacement, but make the new one at a different vehicle depot than the old is scrapped in", right? And "reassign all trucks from logistics zone X to zone Y"?

Personally, since excavators have a habit of trampling the beautiful highway fences on my bridges (model overlap), it does make sense to implement a "transport vehicles by rail" option, and tying that transport to Logistics Zones is a plausible way to make it, well, plausible.

Yes, when I wrote the message, the translator mistranslated the meaning of some words. Yes, the essence of the proposal is that it would be possible to assign another logistics zone for a certain number of units of equipment at once. For example, there are 10 unassigned trucks in zone 1, 5 of them I want to assign to zone 2 or to the general zone. And in the logistics parameters, I just reassign them, and in the reassignment parameters, I choose with disassembly at car plant 1 and assembly at car plant 2.

And yes, in general, I agree that the transportation of collapsible parts could be convenient by rail.

Без имени.png(something like a similar example as in the image)

Edited 7 days ago
35 Showing 13 of 3
Log in to reply.