Railroad Planner Respect for Grade Restrictions: None!

computerneek · 8 days ago

image.png

Under the twelve-percent-grade limit, those track segments go flat-to-12%, 12%-to-25%, 25%-to-12%, 12% straight, 12%-to-flat. Those new track pieces are awesome, but the planner doesn't seem to know how to use them legally.

This seems inappropriate, since the middle of that vertical S-curve is indeed a forbidden 25% grade- and the average across those two pieces is about 17% (1 rise over 6 run, versus the 1:4 of 25% and 1:8 of 12%). Though it is nice that this probably means you can start building from the end of a 25% while the 12% restriction is active, and it'll actually let you build.

Update 4.2 | v0.8.6c (b612)

Reproduction:

  1. Start the track building planner, with 12% grade restriction active.
  2. Minimum height change of 3 if starting from flat, 2 if starting from a 12% grade.
  3. I was using the straight-only modifier, this is not necessary. What is necessary is to position the cursor too close to the starting point for it to find a valid solution on only straight 12% sections, but far enough for it to use 17% sections.
  4. If the grade change (and planning distance) is large enough, it'll use multiple 17% sections.

I was not able to convince my game to do this with curved grade-transition pieces as well, but I'm also not certain that those exist, and was testing on flat terrain (might not be enough grade change available).

16
Showing 1–1 of 1