I want to placements of some buildings or tear a factory down and build a new one instead, for I first have to delete it, then wait for a deconstruction. Only after the old factory is gone, I can start planning it it's place.
Would be great if we could toggle visibility of buildings scheduled for deconstruction and pre-plan the new factory on top of old one even before it was entirely deconstructed. The ghost blueprint will only start building once the old building is entirely gone.
Building over deconstructed buildings
Quality of life
Tools & Construction
100% agree. Frustrating when I'm rip and replacing a pipe for a new layout and I'm not able to plan the build operation until the decontstruct operation is completed. I'd like to see a mode where the stuff being deconstructed is ghosted so I can lay down the plans for the new build without either having to wait for the trucks or spend unity to do a quick destroy.