Currently you have to chain lifts to reach levels higher than 1. Construction parts for example require 3 input materials, so chaining them requires belts at 0, 1 and 2. Waist of tons of space, you need 9 squares between the storage and the assamblies!
The suggestion is to make lifts configurable in regard to which levels they span ( 1-2, 0-3 etc., or at least only from level 0.). This could be done after placing/copying the lift (in blueprint mode?) before it is built.
BR Martin
Conveyor vertical lifts should be configurable to span multiple layers
Quality of life
Logistics
Can't we adjust the number of floors the elevator spans?
Click the left mouse button first, and then QE will switch to adjusting the length of the elevator