Conveyor vertical lifts should be configurable to span multiple layers

Quality of life Logistics
Martin Straub [ideas] · 1 year ago

Currently you have to chain lifts to reach levels higher than 1. Construction parts for example require 3 input materials, so chaining them requires belts at 0, 1 and 2. Waist of tons of space, you need 9 squares between the storage and the assamblies!
The suggestion is to make lifts configurable in regard to which levels they span ( 1-2, 0-3 etc., or at least only from level 0.). This could be done after placing/copying the lift (in blueprint mode?) before it is built.
BR Martin

清风 [ideas] · 1 year ago

Can't we adjust the number of floors the elevator spans?
Click the left mouse button first, and then QE will switch to adjusting the length of the elevator

6 Showing 1–2 of 2