Not sure how to describe that better...
It would be cool to dig/dump/level a minimum grade incline for future tracks.
Dig and dump grade options to match train elevation option
Quality of life
Terrain & Mining
Trains
You can do this today, mostly, it's just a pain to do it. Basically every tile you need to alternate between flat and elevated. Then when you run the 12% incline on the train down it, it runs very close to the ground, touching on the edges.
5
Showing
1–2 of
2