Currently, setting a priority resource (Target Resource) is only possible per excavator, making it tedious to manage multiple units in one tower's area.
Add a "Target Resource" dropdown to the Dispatch Tower interface. When set, this command applies to all assigned excavators, making mass resource switching (e.g., from limestone to iron) instant.
Benefits:
1. Saves significant management time.
2. Improves logistics flexibility.
3. Intuitive control from the central tower.
4. Better strategic control over mining operations.
Global Target Resource Setting for Dispatch Tower
Quality of life
UI & UX
Vehicles & Roads
6
Showing
1–1 of
1