Describe the issue
With out "Empty" option

With "Empty" option


Selecting "Empty" schedule option does not impact the "Avg. Production /60" yield number.
Expected behavior && To Reproduce
See clip from @Nilaus
https://clips.twitch.tv/SlickTemperedBadgerPicoMause-XJgpBIRzGU5sqE37
Select "Vegetables", "+", "Potatoes" as schedule,
->Then "Avg. Production /60" Vegetables = 10.8, Potatoes = 10.4Then select "Vegetables", "Empy", "Potatoes" as schedule, this should add 3 months to the rotation, which should decrease "avg. production / 60", but it does not, Total rotation should be 10 months long now (4 + 3 + 3) vs 7, so expecting lower numbers.
It appears if IsEmptyCrop == true then TotalRotationDurationDays is not incremented correctly during recomputeRotationStats ;)