Planned connector breaks pause tool

Backlog Bad behavior Tools & Construction
ParanoikCZE [github] · 4 years ago

Describe the issue
Planned connector breaks pause tool.

Expected behaviour
As a standalone connector should probably not even exist, it should at least not break the pause tool.

To Reproduce
Check video

Additional context

  • Game version: 0.4.6
Captain Filip Captain Filip · 4 years ago

I'm not sure I follow what breaks there? The connector cannot be paused (which is intended) and it does not need to be paused because it is only buildable once a transport connected to it gets built.

ParanoikCZE [github] · 4 years ago

When pausing the whole block that contains a planned connector, other buildings cannot be paused.

So, evaluation of connectors should be skipped for the pause tool to affect other buildings.

Captain Filip Captain Filip · 4 years ago

I see now, thanks for your clarification.

24 Showing 1–4 of 4