Issue description
The setup of Mining Tower and storage wont be copied the right way when you copy them with copy tool.
Expected behavior
Copy Mining Tower and storage with settings.
Reproduction steps
- Build a Mining Tower and 4 Loose Storage.
- Link 2 of the Storage to the 1st Tower as accepting storage
- Build another Tower as "Dumping Tower"
- Link the other 2 Storage to the 2nd Tower as deliver storage
- Use the copy tool and make a frame around the 1st Tower and all 4 storage.
- Place them somewhere
- Click on the new buildings and see whats happen to the links
Game version
v0.4.12e
Attachments
Copy Tower 5.jpg, Copy Tower 1.jpg, Copy Tower 2.jpg, Copy Tower 3.jpg, Copy Tower 4.jpg
That 5 Pictures will show you what i mean.