Issue description
When placing a pipe in multiple long segments, the priority of placement is ignored.
Reproduction steps
I set one of the priorities for one of the segments to P1 with the up arrow.
Instead of placing there first, segments closer to the storage for the construction 2 parts were placed first even though they were at priority 9.
The pipe segments connect from a crude Oil storage on the back of the Island to the other side of the Island to the main Oil Processing area.
Please see attached files:
Game version and build number
v0.6.3a
Operating system
Windows 10
Attachments
24-04-30_23-01-autosave.save, CraterLake Save1.save