Storage with previously canceled demolish task, will not accept belt input

Fixed
TopKicker [github] · 2 years ago

Issue description

Belts stop at the entrance of a storage that had previously deconstruct tasks canceled.

Attached is a save file where I just finished reproducing it with the second (southern) copper storage next to the copper electrolizer. Saved at the point where I am looking at the copper storage.

Reproduction steps

  1. Build a storage without anything hooked up to it.
  2. Choose to demolish it
  3. Wait for the red box to cover it
  4. Cancel the demolish before any trucks can arrive.
  5. Try to hook a belt up to the storage entrance and transfer some items across the belt.

Game version and build number

v0.6.4a b339

Operating system

Windows

Attachments

El Capitan 2024.save

Files not imported: El Capitan 2024.save

poltime poltime · 2 years ago

It's because of construction paused, click on the pause button.

git

TopKicker [github] · 2 years ago

Oh I see. The building looks completed but needs construction after cancelling a demolish task.

Closed as ✅ Fixed