Issue description
Rail tracks on excavated slopes are shown as a gradient of 25%, but on the previous version, placing a mining or tree planting area showed the areas dimensions in metres. From that a mining tile was 8m x 8m, (smallest squares are 2m x 2m) so the gradient of an excavated slope was 1 in 8 or 12.5% and not 25%. Not easy, but measuring slope on screen agrees with this12.5% value.
Reproduction steps
Make a slope and measure it. Or load old version and look at a mining area.
Game version and build number
v0.7.1c b417
Operating system
Windows