Bridge not completing and only needs 38 Concrete (Found Solution)

Vehicles & Roads
MacAttack-UK [github] · 7 months ago

Issue description

I've been building bridges for the first time and came across an issue completing one of them. Whilst building the first bridge I had to keep recovering the amphibious trucks to get them to finish it but with this 2nd bridge even after save/loading or even allowing partial loads they wouldn't do it until I told one of the trucks to goto the concrete storage and then after a few seconds it collected the concrete and completed the bridge.

Reproduction steps

Load attached save (Save 2026-03-14, 12-42-51.save) and check the bridge that needs to be completed, Click on an Amphibious truck and send it to near the concrete storages then after a second or 2 it'll pickup the concrete and complete the bridge.

Game version and build number

v0.8.1b b551

Operating system

Windows

Attachments

Save 2026-03-14, 12-42-51.save

1 attachment only for registered users
16 Showing 1–1 of 1