Deconstruction a bridge stucks steel and concrete delivery

Vehicles & Roads
Jureth [github] · 7 months ago

Issue description

While a bridge is deconstructing, trucks stop delivering steel and concrete to storages. Assigned trucks just wait even with import route with "accept assigned only" is set.

They resume operating normally when the bridge is fully deconstructed.

Reproduction steps

  1. Load attached save
  2. Check storages circled red on the screenshot

Game version and build number

v0.8.2c b559

Operating system

Windows

Attachments

Image

bridge.save

1 attachment only for registered users
14 Showing 1–1 of 1