Issue description
When dragging an area to build an electrified station with unity, the costs would double when also marking the post for the overhead wires. Having a single electrified station element without connections and marking it completely, the cost is tripled, because it has two posts (start and end) for the overhead wires.
After testing i can say that the increased costs are only cosmetic. You only get charged fo the normal unity and material costs.
Reproduction steps
- build an electrified station element
- mark it completely for building with unity (drag and drop)
- see the increased cost
Game version and build number
v0.8.4b (b593)
Operating system
Windows
Attachments
Normal costs for non-electrified stations:

increased costs for electrified stations when marking the posts:

costs for just marking the post:
