Issue description
After unlocking these modules, I encountered a few bugs:
- If you use “Unity Tool” for quick deliver in electrified version, the number of resources increases
- During installation, I noticed that there’s no difference between the regular and electrified versions—that is, when I installed both versions, they required 2 workers and 150 kilowatts, but if I reload the same save file after returning to the main menu, the electricity requirement disappears for both stations
Reproduction steps
“Quick Deliver” bug:
- Place a Molten Station module (electrified)
- Select the “Unity Tool” and highlight the structure
- Notice that the structure requires more resources, even though the blueprint interface shows a lower requirement
Bug with changing work requirements:
- Place one or both modules
- Open each one and notice that they require 2 workers and 150 kilowatts
- Save and exit to the main menu
- Load the save file
- Open each one and notice that the electricity requirements are missing for both versions
Game version and build number
v0.8.5 (b598)
Operating system
Windows
Attachments
26-07-20_09-44-37_4752.log








