Trains expanded DLC: issue with the two versions of the Molten Station Module

Trains
demycat [github] · 3 months ago

Issue description

After unlocking these modules, I encountered a few bugs:

  1. If you use “Unity Tool” for quick deliver in electrified version, the number of resources increases
  2. During installation, I noticed that there’s no difference between the regular and electrified versions—that is, when I installed both versions, they required 2 workers and 150 kilowatts, but if I reload the same save file after returning to the main menu, the electricity requirement disappears for both stations

Reproduction steps

“Quick Deliver” bug:

  1. Place a Molten Station module (electrified)
  2. Select the “Unity Tool” and highlight the structure
  3. Notice that the structure requires more resources, even though the blueprint interface shows a lower requirement

Bug with changing work requirements:

  1. Place one or both modules
  2. Open each one and notice that they require 2 workers and 150 kilowatts
  3. Save and exit to the main menu
  4. Load the save file
  5. Open each one and notice that the electricity requirements are missing for both versions

Game version and build number

v0.8.5 (b598)

Operating system

Windows

Attachments

26-07-20_09-44-37_4752.log

Image

Image

Image

Image

Image

1 attachment only for registered users
demycat [github] · 3 months ago

In the new version of the game, v0.8.6a (b610), the bug related to the construction cost of the electrified module has been fixed, but the bug related to its operational requirements remains(reproduction steps same).

Logs:
26-07-21_09-44-32_9504.log

Screenshots:
Image
Image
Image
Image

1 attachment only for registered users
11 Showing 1–2 of 2