All transports (besides molten channel) are t1 = 60, t2 = 200, and t3 = 450. The t2s say they are 3x as much throughput as the previous tier, the t3 says 3x on ONLY the t3 pipe. t3 flat and u-shape conveyors say 2x.



All transports (besides molten channel) are t1 = 60, t2 = 200, and t3 = 450. The t2s say they are 3x as much throughput as the previous tier, the t3 says 3x on ONLY the t3 pipe. t3 flat and u-shape conveyors say 2x.


