They all say 28. T2 has slightly different numbers, for the increased rubber cost. Presumably it'd be the same for T3. It's like this for pipes and molten channels as well. Dunno about train tracks, as I don't have them yet.
When placing, you can tell obviously it's not 28. If you wanted to show cost per 28 tiles or something, it should say that.

