I'm not sure if this is an intended mechanic but seems strange so I wanted to post here too. I have these two stations in my network. Important part is that the station in push configuration has a capacity of 740 for tree sapling and is almost full. Normally this station should create train orders to move the content to other station.
I have two T2 trains with two T2 flatbed wagons each, so each train can carry 960 items. Both trains have been sitting idle at the waypoint for a long time. For some reason, these trains are not moving this cargo. I am assuming they don't take the job because it will not utilize their full capacity.
If I edit one train to be single wagon, so 480 capacity, then it starts actively moving the saplings.
I can see this being the intended behaviour as it avoids inefficient routing in a large network. But I feel like if a job is pending for a long time but can't find trains to take it, it might try a larger train so it can be completed.