
Pipes phase through connectors (save incl.)
ok im more interested in that you got connectors to coexist next to eachother
is the pipe generating one to go between the building ports?
yeah, it did. I had no other reason to make a connector there, since those ports are supposed to connect to the top row of pipes.
Cool feature. @kayser_ [discord] will love it ...
Btw. I managed to reproduce it. I.e. I can confirm the issue.

vectrobe [discord] wrote:
ok im more interested in that you got connectors to coexist next to eachother
You can place a connector ghost next to another connector, if the tile is empty. if there is a pipe (or ghost) already you need to deconstruct that first.
RealisticOptimist wrote:
Cool feature. will love it ...
Oh, yeah, this opens up new possibilities 🥴
firefly0518 [discord] wrote:
that shouldn't happen - this is an anomally - I wonder how you made this happen as I'd expect the pipe to go above and to the other side to connect - which version are you on ? would you please give steps to reproduce it ?
Pipes phase through connectors (save incl.)
literally just snapped to the bottom pipe and ended up like that
kayser_ [discord] wrote:
Oh, yeah, this opens up new possibilities 🥴
it's definitely not staying for long so maybe dont lol
so having two pipes adjacent to alocation where two pipe inputs/output exist and ghost building a pipe from that junction to the bottom pipe ?