As per title, the update 4.2 stats sometimes show max total production for Copper exceeding what is possible for the number of factory buildings. Anyone else encountering this issue?
Somehow this only happens with Copper electrolysis. I've checked others and seem fine.
Thanks, this is probably because we report production\consumption when the recipe start (for example you can start two recipes in the same months even if they take 1.5months to complete)
If I may, I think the final input (consumption month) should be at the month of the recipe start and the final output (production month) should be according to the actual month the recipe is finished, so perhaps this requires re-thinking the calculations, not so ?