Right now, the only way to end a bridge/connect it to train systems is to end them at ground level. I think it would be really convenient and practical if we could connect elevated rails to the ends of incomplete bridges, as seen in the image below.
This would be convenient for, for example, connecting surfaces where the height difference is not a multiple of 5, as it is currently impossible to build a bridge between surfaces with heights of for example 3 and 5.
