Updated string.
- Fixed minor (missing) conveyor issues
- Fixed sand supply
- Rerouted exhaust/CO2 on the concrete side
Updated string.
Ran through everything, rerouted cement CO2 to properly route to the scrubber exhaust CO2 rather than the scrubber exhaust lo-steam. Should no longer require further fixes, but do let me know if there are flaws/changes you'd like me to take on!
There is only one belt from salt to the 1st of the 4 mixers. Belt for the other 3 mixers is missing with actual version. And a outgoing belt from one glass blast furnace is missig.
Managed to find missing acid piping for copper electrolysis - fixed in latest string