Change Log moved into the description.
I had two PG4 shafts built that ran fine with no problems. I just recently added the next two shafts and now I keep getting -...turbine II needs a transport to output steam flickering across all shafts and high/low turbines randomly. Its stagnating the power production and i cant figure out what the cause is.
Edit: I found the issue, had to reroute the water egress pip in the front of the frame to accommodate other pipes and somehow had a Pipe 2 instead of Pipe 3 replaced it. Upgraded the pipe and it seems to be working fine now.
Hi Calen -i just registered to thank you for your great blueprints, and by the way- why in Power Generation IV (PG4) input description you wrote it needs 240 coal ? i see there only 4 boilers which every one consumes 30 coal so 4x30=120 or i`am missing something ?. Take care.
@ The Bird Generation IV (PG4) It's probably the last picture above. There are 8 boilers