development and backfilling of the seabed by sea transport and further…

New content Terrain & Mining World Map & Ships
rogger · 4 years ago

development and backfilling of the seabed by sea transport and further development of marine resourc

Filling the bottom is a long process.
There is no way to dig the bottom.
Idea:
- technology tree, docks T1, T2 and T3 and a marine shipyard for the production of digger ships.
- T1 dock internal warehouse - 2 bulk goods, 400 units each. (as in a grocery store), 1 inlet and 1 outlet for tape,
- ΠΆ1 ship with a capacity of 200 units, work level -02 to -10. On board, the excavator is an analogue of the T2 land excavator, dig into the inner hold and take it to the dock.
- T2 dock - 4 goods, 700 each, 2 entrances / exits.
- T2 ship - 350, level -02/-20, excavator - analogue of land T3.
- T3 dock - 6 goods, 1200 each, 3 entrances / exits.
- T3 ship - 600, ship level -02/-30, excavator analog 2 land T3).
- several ships can be connected to 1 dock, as to a control tower on land.
- the ability to develop the seabed, oil deposits, an offshore oil rig can be set to -05 / -10, the soil needs to be raised or lowered, there may be other resources.
PS I apologize for the incorrect translation - google

8 Showing 1–1 of 1