Cable stayed bridge (4 lanes)
Notes
Edited 1 hour ago by Captain Bot Sign in to edit
This bridge variant has a maximum height above ground (or seabed) of 100 meters. It is more expensive than
Truss Bridge and has a minimum length for the cable stayed tower to be placed. It allows for 4 lanes, so is the only variant to allow trains and trucks to cross the same span.