Tutorials

Assigned routes

Tutorial Base game GroupLogistics
From the game, not editable here

By default, trucks handle deliveries automatically, based on the priority settings of buildings. If you need more control over where materials go or which trucks handle them, assigned routes are the way to go. These routes help make your logistics more efficient and reliable.

Assigned routes

A Mine control tower can be assigned to export mined products to a specific ore sorter or storage unit (if the material is unmixed). To set this up, select a Mine control tower (1), click the +/- button under Export routes (2), then choose the desired destinations (3). Clicking a destination assigns it; clicking it again removes it. You can also right-click an assigned destination (4) in the UI to unassign it.

Assigned routes

When a Mine control tower has export routes set to specific destinations for certain products, trucks will deliver those products only to the assigned destinations and nowhere else.

Assigned routes can also be set up between storage units to further optimize your operations, as shown below. Just make sure the destination storage has the Keep full slider enabled (1). You can optionally assign trucks to the receiving storage to be dedicated to this supply line (2). There are also two toggles (3) that let you restrict the storage to only accept deliveries from connected sources and assigned trucks, since routes are not exclusive to the destination by default.

Assigned routes

The following example shows how a train line, combined with assigned routes, can reduce truck trips when dumping mined material. First, assign the Mine control tower to a nearby ore sorting plant (1). The plant is connected to a destination storage unit via a train line (2). That unit has a route set to export to a nearby mine control tower (3), which has a designated dumping area.

Assigned routes

Assigned routes can also be used to assign a Fuel station to a Mine control tower, specifying where trucks and excavators should refuel.

Assigned routes

It's best to use assigned routes strategically — placing them where they provide the most benefit. Micromanaging every route can add unnecessary complexity to your logistics system and may cause problems as your factory grows.

Notes

No notes yet. Sign in to add notes