We have planned the base in advance and upgraded the pipeline to increase transportation volume in the later stage. However, the first level pipeline only allows for -1 level, and if we want a deeper level, we need to demolish and rebuild it, which is very inconvenient
Please do not limit the maximum depth by pipeline type
33
Showing
1–1 of
1