Hi, you can't build a crusher for gravel without construction 2, so either the research needs to be locked behind CPII, or the crusher needs a different construction cost, or a new basic machine needs to be added.
Gravel Issue
Yeah, there needs to be some way to make gravel before Construction II.
Perhaps adding gravel to the kiln. Since if you burn stone long enough it just sorta crumbles irl.
Edited 1 hour ago
35
Showing
1–2 of
2