Usage/Workflows + Bridges

Nexii · 12 minutes ago

This might seem dumb, but what is the intended workflow for using the different pieces?

I've got a section of land I was thinking of carving out, using land wall pieces to retain an upper layer.

What I was trying to do was place the walls, inset into the land, and then dig out the land back into it. This is really awkward to do as the automatic pieces automatically size to the terrain and its hard to carefully match/plan the expected construction depths.

However now am I thinking if instead you are supposed to completely clear the area, place the pieces and then fill back in? It seems that would be a lot of work though.

With the quay pieces I was even having a different problem where I am expanding out to fill in, but the quay pieces are sort of hanging with no terrain below, well probably need to bring out the amphibious vehicles to help grade the terrain there.

I notice that rail tracks can be built to poke out flat over the wall pieces which is great, but I am getting collisions with bridge pieces in my case where the rail is too high up for track support to reach down.

1 Showing 1–1 of 1