Retaining wall (long)
Prevents terrain from collapsing. Walls can be placed below the surface to prevent terrain collapse during mining, or above terrain to aid with dumping operations. The placement elevation is adjustable. Walls will collapse if they hold more than 5 units of height or if they are overfilled.
Variants
5|
|
|
|
|
|
|
|---|---|---|---|---|---|
| Construction cost (At Captain difficulty Sailor: 6 Iron, 24 Concrete slab Admiral: 8 Iron, 30 Concrete slab) At Captain difficulty |
|||||
| Construction time (At Captain difficulty Sailor: 11 s Admiral: 12.6 s) At Captain difficulty Sailor: 11 s Admiral: 13 s |
6.6 s | 11 s | 8 s | 8 s | 8 s |
| Size | 1 x 2, height 1 | 4 x 2, height 1 | 2 x 2, height 1 | 2 x 2, height 1 | 2 x 2, height 1 |
| Upgrades in place | No | No | No | No | No |
Notes
No notes yet. Sign in to add notes