Showing Sailor values. Back to Captain
Blast furnace
Smelts various materials such as iron or copper. The output is a molten material that needs to be sent via molten channel transport, for instance, into a caster for further processing. Molten materials cannot be transported via trucks.
Tiers
4|
|
|
|
|
|
|---|---|---|---|---|
| Construction cost (At Sailor difficulty Captain: 60 Construction Parts Admiral: 75 Construction Parts) At Sailor difficulty Captain: Admiral: |
||||
| Construction time (At Sailor difficulty Captain: 17 s Admiral: 20 s) At Sailor difficulty Captain: 17 s Admiral: 20 s |
17 s | 41 s | 37 s | 33 s |
| Available from the start | Yes | No | No | No |
| 8 | 18 | 12 | 14 | |
| Size | 9 x 6, height 7 | 9 x 6, height 9 | 9 x 6, height 7 | 9 x 6, height 7 |
| Upgrades in place | Yes | Yes | Yes | No |
| Maintenance | ||||
| Power consumed | ||||
| Cannot be boosted | No | No | Yes | Yes |
Recipes
6Notes
No notes yet. Sign in to add notes