Showing Sailor values. Back to Captain
Cooled caster
Casts molten materials into slabs. This one also utilizes water for cooling.
Tiers
2|
|
|
|
|---|---|---|
| Construction cost (At Sailor difficulty Captain: 30 Construction Parts II Admiral: 38 Construction Parts II) At Sailor difficulty Captain: Admiral: |
||
| Construction time (At Sailor difficulty Captain: 11 s Admiral: 12.6 s) At Sailor difficulty Captain: 11 s Admiral: 13 s |
11 s | 13 s |
| Upgrades in place | Yes | No |
Recipes
1Notes
No notes yet. Sign in to add notes