Showing Admiral values. Back to Captain
Cooled caster II
Casts molten materials into slabs. This one also utilizes water for cooling.
Tiers
2|
|
|
|
|---|---|---|
| Construction cost (At Admiral difficulty Captain: 40 Construction Parts III Sailor: 40 Construction Parts III) At Admiral difficulty Captain: Sailor: |
||
| Construction time (At Admiral difficulty Captain: 13 s Sailor: 13 s) At Admiral difficulty Captain: 13 s Sailor: 13 s |
13 s | 15 s |
| Upgrades in place | Yes | No |
Recipes
2Notes
No notes yet. Sign in to add notes