Transports

Showing Sailor values. Back to Captain

U-shape conveyor II

Transport Base game
Transports bulk materials. Can carry multiple product types at the same time.

Tiers

3
U-shape conveyor I U-shape conveyor II This page U-shape conveyor III
Construction cost (At Sailor difficulty Captain: 28 Construction Parts III per 100 tiles, 56 Rubber per 100 tiles Admiral: 35 Construction Parts III per 100 tiles, 70 Rubber per 100 tiles) 2828per 100 tiles 2856per 100 tiles 5684per 100 tiles
Maintenance (At Sailor difficulty Captain: 2 Maintenance I per month per 100 tiles Admiral: 2.5 Maintenance I per month per 100 tiles) 0.5per monthper 100 tiles 1per monthper 100 tiles 1.8per monthper 100 tiles
Throughput 60per minute 200per minute 450per minute
Speed 0.6tiles per second 1.2tiles per second 2tiles per second
Power consumed 20kWper 100 tiles 40kWper 100 tiles 80kWper 100 tiles
Upgrades in place Yes Yes No

Carries

57

Notes

No notes yet. Sign in to add notes