Showing Sailor values. Back to Captain
Retaining wall (corner)
Prevents terrain from collapsing. Walls can be placed below the surface to prevent terrain collapse during mining, or above terrain to aid with dumping operations. The placement elevation is adjustable. Walls will collapse if they hold more than 5 units of height or if they are overfilled.
Variants
5|
|
|
|
|
|
|
|---|---|---|---|---|---|
| Construction cost (At Sailor difficulty Captain: 3 Iron, 12 Concrete slab Admiral: 4 Iron, 15 Concrete slab) At Sailor difficulty |
|||||
| Construction time (At Sailor difficulty Captain: 8 s Admiral: 8.8 s) At Sailor difficulty Captain: 8 s Admiral: 8.8 s |
6.6 s | 11 s | 8 s | 8 s | 8 s |
| Size | 1 x 2, height 1 | 4 x 2, height 1 | 2 x 2, height 1 | 2 x 2, height 1 | 2 x 2, height 1 |
| Upgrades in place | No | No | No | No | No |
Notes
No notes yet. Sign in to add notes