Level crossing entrance (large)
A ramp allowing vehicles to enter or exit a level crossing from ground level.
Variants
2|
|
|
|
|---|---|---|
| Construction cost (At Captain difficulty Sailor: 40 Construction Parts, 40 Concrete slab Admiral: 50 Construction Parts, 50 Concrete slab) At Captain difficulty |
||
| Construction time (At Captain difficulty Sailor: 21 s Admiral: 25 s) At Captain difficulty Sailor: 21 s Admiral: 25 s |
13 s | 21 s |
| Size | 4 x 8, height 6 | 6 x 12, height 8 |
| Upgrades in place | No | No |
Notes
No notes yet. Sign in to add notes