Fluid station module
Handles loading and unloading of train wagons with fluid cargo.
Tiers
2|
|
|
|
|---|---|---|
| Construction cost (At Captain difficulty Sailor: 30 Construction Parts III Admiral: 38 Construction Parts III) At Captain difficulty Sailor: Admiral: |
||
| Construction time (At Captain difficulty Sailor: 11 s Admiral: 12.6 s) At Captain difficulty Sailor: 11 s Admiral: 13 s |
11 s | 12 s |
| Upgrades in place | Yes | No |
Notes
No notes yet. Sign in to add notes