Showing Admiral values. Back to Captain
Level crossing connector
An elevated road that connects neighboring level crossings.
Variants
2|
|
|
|
|---|---|---|
| Construction cost (At Admiral difficulty Captain: 10 Concrete slab Sailor: 10 Concrete slab) At Admiral difficulty Captain: Sailor: |
||
| Construction time (At Admiral difficulty Captain: 7 s Sailor: 7 s) At Admiral difficulty Captain: 7 s Sailor: 7 s |
7.6 s | 10 s |
| Size | 1 x 8, height 6 | 1 x 12, height 8 |
| Upgrades in place | No | No |
Notes
No notes yet. Sign in to add notes