Showing Admiral values. Back to Captain
Level crossing entrance
A ramp allowing vehicles to enter or exit a level crossing from ground level.
Variants
2|
|
|
|
|---|---|---|
| Construction cost (At Admiral difficulty Captain: 20 Construction Parts, 20 Concrete slab Sailor: 20 Construction Parts, 20 Concrete slab) At Admiral difficulty |
||
| Construction time (At Admiral difficulty Captain: 13 s Sailor: 13 s) At Admiral difficulty Captain: 13 s Sailor: 13 s |
15 s | 25 s |
| Size | 4 x 8, height 6 | 6 x 12, height 8 |
| Upgrades in place | No | No |
Notes
No notes yet. Sign in to add notes