Buildings

Showing Admiral values. Back to Captain

Molten station module

Building From the Trains expanded DLC
Handles loading and unloading of train wagons with molten cargo.

Variants

2
Molten station module From the Trains expanded DLC This page Molten station module (electrified) From the Trains expanded DLC
Construction cost (At Admiral difficulty Captain: 60 Construction Parts III Sailor: 60 Construction Parts III) 75 7513
Construction time (At Admiral difficulty Captain: 17 s Sailor: 17 s) 20 s 23 s
Upgrades in place Yes No

Notes

No notes yet. Sign in to add notes